Progress video from the Saltdean Lido

We are delighted to share a fantastic progress video from our Saltdean Lido project in Brighton.

As the main contractors for the restoration of the Saltdean Lido, Aqua Platinum have been appointed to design and build both the main pool
and children’s pool, complete with interactive water features and slides, as well as all of the pipework, plant room and equipment.

Within the video, you will be able to see the project from the very start through to the marquee being erected above the main pool so that the rendering and finishing can be completed.

This is a fantastic project and we cannot wait to share the next update with you.

Contact

Get in touch

Preferred Contact