Nightingale Place | Swimming Complex
Multi-Million Pound Retirement Village
Luxury Swimming Pool Complex
We have been building our ever-growing relationship with McLaren Construction, to build this luxury swimming pool complex within the basement of Audley Nightingale Place, a multi-million-pound retirement village in Clapham Common, London.
Construction started on the project in 2018 and is now ready for residents to move in and start enjoying the facilities. Formerly a 5 storey Metropolitan Police HQ ,the deluxe development includes a 14m basement swimming pool with a feature wall, two swim jet counter-current systems within the swimming pool. It also includes a luxurious spa which includes powerful massage jets and stations, a traditional sauna and a bespoke steam room that is finished in the highest quality mosaics. It really is the perfect place for residents to relax.
The plantroom, also located in the basement of the development, houses a high-quality filtration system that has been installed by our in-house engineers. This includes two Waterco 900m deep bed filters for the swimming pool, two Waterco 750mm deep bed filters for the spa pool, high-quality filtration pumps and fully automatic chemical dosing systems. This ensures the swimming pool and spa maintain optimum water clarity and sanitation.
If you are interested in building your own luxury swimming pool or spa facilities, then get in touch with our friendly and expert team today. Contact us on 01489 896 438 or fill out our online form!